Exposed aggregate concrete is poured 100mm thick on a compacted AP40 gravel base. A retarde is spreyed on the trowelled surface and waterblaster the following day. This exposed surface reveals the natural textures of river stones and crushed quarry stones. Available in a range of stones and colour combinations can be added to change the appearance. This is later acid washed and sealed to complete the finish. It is recommended you avoid driving on your concrete for at least 7 days after pouring.